
Περισσότερα... »
skip to content
Serres Blogs » Karamarigo | |||
|
Τα επιλεγμένα blogs του νομού Σερρών με μια ματιά |
|||
7352 άρθρα από 86 πηγές
Aa - Zz
(2098)
Αα - Ωω
(5254)
2007
At the end of year Degree Show on the 8th June 2007 I received “Best in Show”.
2006
3rd place in a design competition. The brief was the design a Singapore venue for the global nightclub giant Ministry of Sound. Link 1
[Image:Degree Show 2007.Derby].
Prepare information regarding design, specifications, materials, and equipment.
Develop design ideas and create design presentations.
Direct the production of construction documents and drawings.
Review architectural documents for potential conflict with all disciplines.
Projects: Communication, Education, Housing, Mixed Used, Offices, Retail.
[Image: Westpoint Apartments.Derby].
[Image: Home extension.Proposal].
[Image: Main Entrance].
[Image: 3D Model].
[Image:Design Strategies].
Project no2 (Derby University)
The Brief
A local council wishes – in conjunction with a regional arts body – to build a multipurpose venue that will act as a centre of excellence for a broad range of music and entertainment within the city and the wider area.
The venue will act as a performance centre for the city’s youth orchestra and will provide a home for the East Midlands Sinfonia orchestra, a professional orchestra dedicated to making live orchestral music available to a broad section of the community.
The council recognises that the venue is unlikely to be commercially viable if it relies solely on revenue from classical events. Therefore, the design and infrastructure must ensure that a wide range of events can take place. These may include, but are not restricted to:
Amplified popular music, World music
Classical recitals and performances, Choral music
Music tuition for youth orchestras, Dance
Theatre, Conferences, Sports events (e.g. snooker), Exhibitions
Normal 0 false false false EN-GB X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin;}
Modelling reverberation time
Reverberation is the persistence of sound in a particular space after the original sound is removed. When sound is produced in a space, a large number of echoes build up and then slowly decay as the sound is absorbed by the walls and air, creating reverberation, or reverb.Reverberation time is the time required for a sound in a room to decay by 60 db (called RT60) and defined for wide band signals.
When talking about the decay of an individual frequency, the term decay time is used. The optimum reverberation time auditorium or room of course depends upon its intended use. Around 2 seconds is desirable for a medium-sized, general purpose auditorium that is to be used for both speech and music. A classroom should be much shorter, less than a second. And a recording studio should minimize reverberation time in most cases for clarity of recording.
The reverberation time is strongly influenced by the absorption coefficients of the surfaces as suggested in the illustration, but it also depends upon the volume of the room as shown in the Sabine formula.
[Image:Site Analysis & Green spaces.Derby].
V: volume of enclosure
A: effective absorbing area
A=ΣaiSi
A=a1S1+a2S2+a3S3+…
And a is the absorption coefficient associated with a given area S.
W=22m, L=50m, H=17.5m (auditorium)
V=W*L*H V=14300m H=13m(4,5m closed space with clouds)
S1=L*H=650m2 S2=W*H=286m2
F (floor) =50*22=1100m2 C (ceiling) =50*22=1100m2
A=S1+S2+F+C
125 Hz: A=1164.28m2
250 Hz: A=1655.72m2
500 Hz: A=1345.72m2
1k: A=1242.72m2
2k: A=1378.4m2
4k: A=932.6m2
RT60=0.161V/A 125 Hz: T=1.97 sec.
250 Hz: T=1.39 sec.
500 Hz: T=1.71 sec.
1k: T=1.85sec.
2k: T=1.67 sec.
4k: T=2.46 sec.


[Image:Byzantine hagiography].
The Brief
You are required to undertake research, explore, critically analyse and present study of emerging trends in digital architecture and creative digital design. It is expected from you to concentrate on the work of a single designer/architectural practice prominent in the field.
Research, explore, critically analyse and present study of creative digital design thinking in building projects for a chosen professional practice.
Concept Development
Using the research findings as your design inspiration, you are required to produce conceptual ideas/concept sheets for the brief and site agreed with lecturer. The conceptual work should be a mixture of both 2D/perspective sketches by hand and CAD work and it should take account of the relevant contextual and site research/analysis issues.
[Image:Research.UN Studio].
[Image:Research.Mobius House]. [Image:Concept.Sketch]. [Image:Building.Site].
20a Horsefair, Staffordshire
Extensive refurbishment of residential bungalow and renovatation of Coachhouse into offices for accountancy practice in Rugeley.
Albany Road ,Derby
Construction of 22 apartments in Derby on a shell-only package.
Argyll Street ,Ripley
Design and build 7 apartments in Ripley, Derbyshire.
Bearwood Hill Road , Winshill, Burton-on-Trent
Construction and fit-out of 5 apartments in the Winshill area of Burton-on-Trent.
Pastures Hill - Derby
Were commissioned to construct and fit out a large bespoke luxury detached dwelling with an additional annexed living area in a prime location in Derby.
Commercial Sector
Atos Origin
Medical Services
Complete refurbishment of vacant premises and formation of medical exam rooms complete with waiting areas, office accommodation and supporting services at the following locations: Canary Wharf, East Croydon, Romford
Cambridge
Complete internal refurbishment and fitting out of a 2 storey office block comprising builders work, partitioning, sanitaryware, kitchen installation and floor, wall and ceiling finishes.
Reading
Complete internal refurbishment and fitting out of the third floor office accommodation comprising builders work, partitioning, kitchen installation and floor, wall and ceiling finishes.
Cranfield University
IVHM Centre of Excellence
Design and Build contract for the new high profile research and lab facilty at Cranfield University, Milton Keynes.
Xaffinity Paymaster, Crawley
Roofing and Boiler works and ground floor fit out of the Xafinity Paymaster General Head Office in Crawley
Butterley Office,Derbyshire
Renovatation of old storage space into offices for the employes meeting room, canteen and locker room in Butterley Derbyshire.
Marley Eternit, Derbyshire
Renovatation of old storage space into offices, laboratory, kitchen, storage and meeting room for Marley Eternit company Derbyshire.
Potter Clarkson, Nottingham
Renovatation of old office space into offices, kitchen, storage meeting room for Potter Clarkson, 58 Ropewalk Nottingham.
Knowsley Kitchen
Design and install new kitchen for a private office.
Rodbaston college
Proposed TV stand with storage space for a private house
Pilkington McPhee Partnership Ltd
Prepare 3D model for a sing about a new properties at Station road
Chellaston
Winfield Project
Space planning and furniture selection for private loft house.
2006-2007 Domiki kataskevon Makedonias Thessaloniki,Greece
Natural Gas Network (Central Greece, Thessaloniki-Larissa)
Redrawings and space planning for a several offices and private house
Kalamaria, Thessaloniki
Design and build 3 apartments.
Kalamaria, Thessaloniki
Refurbishment of residential house.
Tsimiski road, Thessaloniki
Office design.
|
Hellas Blogs: Thesprotia Blogs (Θεσπρωτία) Kilkis Blogs (Κιλκίς) Kozani Blogs (Κοζάνι) Halkidiki Blogs (Χαλκιδική) Syros Blogs (Σύρος) Trikala Blogs (Τρίκαλα) |
